Current transformers

All CELSA current transformers in one list: plug-on CTs for new installations, split-core CTs for retrofits without disconnecting, calibrated CTs for billing, protection CTs for protection relays and summation CTs for several feeders. Made in Römerberg, Germany, to DIN EN 61869. Below the list: the guide on function, types, ratio, accuracy classes, burden, connection and selection.

Not sure which transformer fits?

The assistant asks step by step about purpose, mounting and current and shows the matching articles.

Start the transformer finder

Sub-groups

Products

Current transformer working principle on the CELSA plug-on current transformer ALO: cable with 250 A through the window, look inside at iron core and 50-turn secondary winding, 5 A secondary current through S1 and S2, rotary cover with integrated short-circuit bridge
How a current transformer works: the high current in the primary conductor creates a magnetic field in the iron core, from which the secondary winding delivers a small current at a fixed ratio – 5 A for a 250/5 A transformer.

Which current transformer fits?

TypeApplicationPrimary currentSecondaryClasses
Plug-on CT ALOnew installation, switchgear, main distributionup to 6000 A1 A, 5 A, 333 mV0.5 – 3
Wound primary CT WALOsmall currents with own primary winding1 A – 40 A1 A, 5 A, 333 mV0.5, 1
Split-core CTsretrofit without disconnecting, cable and busbar60 A – 3000 A1 A, 5 A, 333 mV0.5, 1, 3
Calibrated CTsbilling to third parties1 A – 5000 A1 A, 5 A0.2S – 0.5
Protection CTsprotection relays, overcurrent protection75 A – 4000 A1 A, 5 A5P5 – 10P10
Summation CTsseveral feeders on one meter2 – 9 inputs1 A, 5 A0.5, 1
Rogowski coilsvery high currents, confined spaces, no iron coreflexiblevoltage signal–

The filters of the list narrow down ratio (e.g. 400/5 A) and window; every ratio has its own overview, such as current transformer 400/5 A. All ratios and types are listed below under “Current transformers by ratio”.

What is a current transformer?

A current transformer is an instrument transformer for alternating current. It maps the current in the primary conductor – cable or busbar – at a fixed ratio to a small secondary current, usually 5 A or 1 A, which meters, instruments, transducers and protection relays can handle safely. The conductor passes through the window of the transformer; on wound primary CTs it is connected to the primary terminals. The alternating current creates an alternating magnetic field in the iron core, which induces the current in the secondary winding at the transformation ratio: with a 250/5 A transformer, 5 A flow on the secondary side when 250 A flow on the primary side.

The devices hang on the secondary circuit. Their consumption and the wiring form the burden that the transformer must drive with its rated output in VA. The secondary circuit must never be left open under load, otherwise dangerous voltages arise at the terminals. On the CELSA transformers ALO, KALO and WALO the short-circuit bridge sits in the rotary cover: turn the cover, the transformer is short-circuited and the meter can be disconnected. CELSA manufactures all current transformers in Römerberg to DIN EN 61869; the housing is made of self-extinguishing polycarbonate V0 to UL 94.

Types: plug-on, wound primary, split-core, protection and summation CTs

Plug-on current transformers ALO (window type) are the standard type for new installations, main distribution boards and control cabinets: the conductor passes through the window, so the circuit has to be opened for installation. Primary currents up to 6000 A at a depth of only 30 mm; mounting material for busbar or cable is included, the snap-on bracket for DIN rail EN 50022-35 is available as an accessory. For very high currents beyond the plug-on range and for confined spaces, Rogowski coils are the alternative: flexible air coils without iron core and without saturation.

Wound primary current transformers WALO have their own primary winding for small primary currents from 1 A to 40 A. Split-core current transformers are opened, placed around the existing conductor and closed again; the primary circuit stays in operation. Three types: cable split-core CTs TQ and TC for 60 A to 1000 A, secured with UV-resistant cable ties, the KALO for cable and busbar from 100 A to 1000 A, and busbar split-core CTs IAG, IAM and IAP for 60 A to 3000 A, which latch audibly onto the busbar.

Calibrated current transformers ALO-E and WALO-E are conformity-assessed and approved for billing; the type is approved by the Physikalisch-Technische Bundesanstalt (PTB). Protection current transformers in classes 5P5 to 10P10 for 75 A to 4000 A transmit even high overcurrents faithfully to protection relays and have double secondary terminals for short-circuiting. Summation current transformers SSR and SSRK add the secondary currents of 2 to 9 main CTs so that one meter measures the total current of several feeders. A comparison of all types with installation, window and classes is in current transformer types compared.

Ratio: primary and secondary current

The ratio – for example 400/5 A – states the rated primary current and the rated secondary current. Their quotient is the CT factor: 400/5 A gives 80, 400/1 A gives 400; the meter uses it to scale the secondary current back to the primary current. Choose the rated primary current just above the highest operating current of the conductor. A heavily oversized transformer is less accurate at partial load, because the error limits to IEC 61869-2 at 5 % and 20 % of rated current are wider than at 100 %.

5 A secondary is the standard for meters and instruments close to the transformer. 1 A pays off with long measuring leads: cable losses rise with the square of the current and at 1 A are one twenty-fifth of the losses at 5 A. 333 mV is delivered by transformers for energy meters and monitoring systems with voltage input. Every ratio has its own overview, such as current transformer 400/5 A, 100/5 A or 150/5 A; all versions with 1 A secondary current are collected on current transformers 1 A. Ratio, CT factor and secondary current are worked out in the guide calculating a current transformer.

Accuracy classes 0.2, 0.5, 0.5S, 1 and 3

The accuracy class states the permissible ratio error in percent at rated current. A class 0.5 transformer may deviate from the ideal ratio by at most ±0.5 % at 100 % and 120 % of rated primary current and shift the current by at most ±30 minutes of arc. At 20 % and 5 % of rated current the limits are wider; below 5 % the standard specifies nothing for classes 0.2, 0.5 and 1. The S classes 0.2S and 0.5S are specified down to 1 % of rated current and already hold the full class value from 20 % – they suit metering points whose load is often far below rated current. Class 3 is only specified between 50 % and 120 % and intended for display only.

Error limits to IEC 61869-2

Class1 % In5 % In20 % In100–120 % InPhase displacement at In
0.2S±0.75 %±0.35 %±0.2 %±0.2 %±10′
0.2–±0.75 %±0.35 %±0.2 %±10′
0.5S±1.5 %±0.75 %±0.5 %±0.5 %±30′
0.5–±1.5 %±0.75 %±0.5 %±30′
1–±3 %±1.5 %±1 %±60′
3–––±3 % (50–120 % In)not specified

In = rated primary current. “–”: the standard specifies no limit at this point. Valid at rated frequency and 25–100 % of rated burden (class 3: 50–100 %).

Billing to third parties requires calibrated (conformity-assessed) transformers together with an MID meter; the class required is set by the grid or metering point operator, usually 0.5, 0.5S, 0.2 or 0.2S. For energy monitoring and operational metering class 1 is usually sufficient, for load comparisons with a lot of partial load class 0.5 or 0.5S. CELSA manufactures metering transformers in classes 0.5, 1 and 3, calibrated transformers in 0.2S, 0.2, 0.5S and 0.5, protection transformers in 5P5 to 10P10. In detail: current transformer accuracy classes and the class comparison per operating point.

Burden and rated output in VA

The burden is the load in the secondary circuit: the consumption of the connected devices, the resistance of the measuring lead (outgoing and return conductor) and the contact resistances at the terminals, stated in VA at rated secondary current. The rated output of the transformer must cover the burden. If the burden is higher, the core saturates earlier and the transformer reads low; if it is much lower than the rated output, the class is not guaranteed either, because it applies between 25 % and 100 % of the rated burden.

Worked example: 5 A secondary, 10 m one-way lead length, copper 2.5 mm². The lead resistance is 2 · 10 m · 0.0178 Ω·mm²/m / 2.5 mm² = 0.1424 Ω, the cable loss 5² · 0.1424 Ω = 3.56 VA. With a 0.5 VA meter this gives 4.06 VA – a transformer with 5 VA rated output fits. With 1 A secondary the cable loss would be 0.14 VA. The VA calculator works with your values; formula, table per cross-section and the conversion to ohms are in the guide calculating the burden.

Connection: P1/P2, S1/S2 (k/l) and earthing

On the primary side every current transformer is marked P1 and P2 (formerly K and L): P1 faces the supply, P2 the load. The secondary terminals S1 and S2 (formerly k and l) lead to the current path of the instrument, on an energy meter to the current input of the same phase. In three-phase systems each phase gets its own transformer. A transformer mounted the wrong way round reverses the sign on meters, power meters and transducers.

If the secondary circuit is earthed, it is earthed at exactly one point – at S1 (k) or at S2 (l), the same on all transformers of a metering point. Which terminal is specified by the grid operator’s technical connection conditions or the design; a second earth forms a loop with compensating currents. Before the secondary circuit is opened the transformer is short-circuited: with a CT test terminal, on ALO, ALO-E, KALO and WALO with the short-circuit bridge in the rotary cover, on protection CTs with the double secondary terminals. Wiring diagram and steps: connecting a current transformer.

Current transformers for meters and transducers

CT-operated energy meters such as DMC6 MID and ECM6 MID are connected to current transformers with 1 A or 5 A secondary current; the CT factor is set on the meter. For billing third parties an MID meter and calibrated transformers belong together. If several feeders are to be metered by one meter, a summation current transformer adds the secondary currents. Which transformers suit which meter is shown on current transformers for meters.

A 4–20 mA signal for PLC and control systems is not delivered by the current transformer itself but by a downstream transducer: the power transducers Pw-MU, Pnz-MU, Pz-MU, Pd-MU and Pdr-MU have current inputs for 1 A or 5 A and are connected to the secondary side. More under 4–20 mA transducers and in the guide current transformer with transducer.

Choosing the right current transformer

Four values decide: the rated primary current (just above the highest operating current), the secondary current of the instrument (5 A, or 1 A for long measuring leads), the accuracy class (0.5 or better for billing, otherwise usually 1) and the burden in VA needed by instrument and lead together. The type follows from the installation: if the conductor is free (new installation), the plug-on CT is the common and most economical solution; to retrofit a live installation, a split-core CT is placed around the cable or busbar. Cable diameter or busbar size determine the window.

The guide choosing a current transformer explains it step by step; the transformer finder asks for the same values and ends with matching versions and article numbers. Ratios not in the list are made by CELSA on request.

Frequently asked questions

What is a current transformer?

An instrument transformer for alternating current that maps a high primary current at a fixed ratio to a small secondary current – usually 5 A or 1 A – that meters, instruments and protection relays can handle safely. A 400/5 A transformer delivers 5 A to the instrument at 400 A in the conductor.

Which ratio do I need?

Choose the rated primary current just above the highest operating current of the conductor and the secondary current according to the instrument input (5 A or 1 A). Every ratio has its own overview, e.g. current transformer 400/5 A or 100/5 A.

How do I calculate the transformation ratio?

Rated primary current divided by rated secondary current: 400/5 A gives the CT factor 80, 150/5 A gives 30, 400/1 A gives 400. With 200 A in the conductor of a 400/5 A transformer it delivers 2.5 A; the meter multiplies by 80 and shows 200 A.

What is the difference between class 0.5 and 0.5S?

Both allow ±0.5 % at rated current. The S class is specified down to 1 % of rated current (±1.5 %) and already holds the full class value from 20 %; class 0.5 is only specified from 5 % and allows ±1.5 % there. Where the load is often far below rated current, a 0.5S transformer is more accurate at partial load.

Which current transformers are approved for billing?

Billing to third parties requires calibrated (conformity-assessed) current transformers together with an MID meter. CELSA makes the plug-on CTs ALO-E and the wound primary CTs WALO-E with PTB type approval in classes 0.2S, 0.2, 0.5S and 0.5.

Does the circuit have to be interrupted for installation?

For a plug-on CT yes, because the conductor is passed through the window. Split-core CTs are opened and placed around the conductor – without interrupting the primary circuit.

Why must the secondary circuit be short-circuited?

While primary current flows, the transformer keeps driving its secondary current. At open terminals dangerously high voltages arise and the core can become permanently magnetised. Before an instrument is disconnected, S1 and S2 are therefore short-circuited – on ALO, KALO and WALO with the short-circuit bridge in the rotary cover.

Is k (S1) or l (S2) earthed?

Exactly one of the two secondary terminals is earthed, the same one on all transformers of a metering point. Which one is specified by the grid operator’s connection conditions or the design. Never earth both terminals or at several points.

1 A or 5 A secondary current?

5 A for meters and instruments close to the transformer. For long measuring leads 1 A: the cable losses are then one twenty-fifth of the losses at 5 A. All versions with 1 A are on the page current transformers 1 A.

Are there three-phase current transformers?

In three-phase systems each phase gets its own current transformer; transformer, current path and voltage path of the meter must belong to the same phase. A three-phase measurement therefore uses three transformers of the same ratio.

Are there current transformers with a 4–20 mA output?

A current transformer delivers 1 A, 5 A or 333 mV. The 4–20 mA signal comes from the downstream transducer, for example the power transducers Pw-MU to Pdr-MU with 1 A or 5 A current input.

Current transformers by ratio

Every ratio has its own overview with all matching types; each design has its own pages. Also: current transformers 1 A · current transformers for meters · overview by ratio and design